RSS Feeds   |   Home  | 
Licensing qualifications
Modifications

The Bureau has the power to modify the conditions of a particular licence, subject to following the correct modification process as set out in Law No (2) of 1998, as amended. The process includes publicly notifying any proposed modification as well as consulting with and obtaining the agreement of the licensed operator. A summary of the most recent licences modified, together with the reasons for modification, are set out below. The full licence (as modified) may be downloaded from here

Licence modified
Effective date of modification
Reason for modification
Gulf Total Tractebel Power Company (GTTPC)
14 February 2007
Electricity generation capacity increased by a further 250 megawatts.
Abu Dhabi Sewerage Services Company (ADSSC) 21 February 2007 Minor revision to Part 1 of ADSSC's licence, regarding modifications
Arabian Power Company (APC)
15 October 2007
Period of the Licensed generation and desalination capacities extended for a further two years from 31 December 2008 to 31 December 2010.

Emirates Sembcorp Water and Power Company (ESWPC)

1 January 2008

Modification to add electricity generation as licensed activity

Abu Dhabi Sewerage Services Company (ADSSC) 23 March 2008 Changes to licence conditions, charge restriction conditions and addition of Schedule 2.
Al Mirfa Power Company (AMPC) 5 January 2009

Electricity generation capacity increased by a further 256 megawatts.

Aldar Properties PJSC 9 June 2009 Modification to incorporate an additional sewage treatment facility on Yas Island , previously operated by ALDAR Laing O'Rourke.
Archirodon Construction (Overseas) Co. S.A. 12 November 2009 Increased wastewater treatment capacity by 400 m3 per day

Abu Dhabi Sewerage Services Company (ADSSC)

1 January 2010 Incorporate changes to Conditions 9 and 15 and Charge Restriction Conditions Schedule for PC4
Abu Dhabi Transmission and Despatch Company (TRANSCO) 1 January 2010 Incorporate changes to Conditions 8 and 18, Charge Restriction Conditions and revised definitions of Trade Effluent and Trade Premises

Ruwais Power Company (S2)

8 April 2010 Increase in the electricity generating capacity
Arabian Power Company (APC) 3 May 2010 Extension to period of existing licensed generation and desalination capacities for a further five years until 31/12/2015
Abu Dhabi Future Energy Company (ADFEC) 10 May 2010 Incorporate expected increase in Embedded Generation (Solar) installations to 50MW at Masdar City
Shams One Company LLC 11 January 2011 Transfer of the Licence from Shams One Company LLC to the Shams Power Company PJSC

Tourism Development and Investment Company (TDIC)

4 March 2011 Extended the duration of the Licence by 24 months and reduced desalination capacity by 1,000 m3 per day

Abu Dhabi Water and Electricity Company (ADWEC)

17 May 2011 Incorporate changes to Charge Restriction Conditions Schedule for new price controls, amendments to purchasing fuel requirements of Conditions 16 and 18, minor changes to Conditions 6, 7 and 17 and consequential and typographical changes

Al Ain Distribution Company (AADC)

31 May 2011 Incorporate changes to Conditions 9 and 18, Charge Restriction Conditions Schedule 2 for PC4 and Emiratisation and consequential changes elsewhere

Abu Dhabi Distribution Company (ADDC)

1 June 2011 Incorporate changes to Conditions 9 and 18, Charge Restriction Conditions Schedule 2 for PC4 and Emiratisation and consequential changes elsewhere